IC1Florida Energy Project
Statewide Pilot Project 12 Fuel Production Refineries
67 Clean Energy Plants "ZERO WASTE"75 Megawatt each!
Each county of Florida shall receive one advanced technology waste to energy power production plant of 75 megawatt per hour and site capacity with the minimum design of 80 MWh and is site specific, self sustainable
Business modeling site plan will consist of property of 10 acres and up with design for one onsite waste to energy molecular processors for production of liquid and or gaseous fuels depending on site design. One refinery can produce fuel to operate at full capacity six of our highly efficient 75 MWh jet turbine generators.
Our initial plan shall be for12 primary refinery sites that will supply fuel for all 67 county sites. Each site will have the basic design of 4 acres for the fuel refinery for a multitude of processing systems and 6 modular build power plants of 75 MWh each on the minimum of one acre each. Additional refineries will be manufactured so that each county will have a secure self sustainable clean energy production facilities for scheduled for 80 MWh per site at startup.
Six counties will be grouped with the best case logistics for each of the Molecular Fuel Refineries for close in proximity delivery of fuel weekly or even daily if required.
Business modeling site plan will consist of property of 10 acres and up with design for one onsite waste to energy molecular processors for production of liquid and or gaseous fuels depending on site design. One refinery can produce fuel to operate at full capacity six of our highly efficient 75 MWh jet turbine generators.
Our initial plan shall be for12 primary refinery sites that will supply fuel for all 67 county sites. Each site will have the basic design of 4 acres for the fuel refinery for a multitude of processing systems and 6 modular build power plants of 75 MWh each on the minimum of one acre each. Additional refineries will be manufactured so that each county will have a secure self sustainable clean energy production facilities for scheduled for 80 MWh per site at startup.
Six counties will be grouped with the best case logistics for each of the Molecular Fuel Refineries for close in proximity delivery of fuel weekly or even daily if required.
Our IC1Florida County Community Infrastructure Project shall be designed to offer the cleanest of energy in addition to offering funding to each Florida County Government Organizations direct financial support.
Initial Site of 75 MWh produces 1,800,000 KWh per day and site designed for 10,800,000 KWh/day or annually 3,942,000,000 KWh at Basic Design Capacity. This volume of production would dedicate over $1,971,000 each year for energy alone for maintaining funding for local citizens of the community for local governing offices and voting support systems to maintain integrity in state and community offices.
Initial Site of 75 MWh produces 1,800,000 KWh per day and site designed for 10,800,000 KWh/day or annually 3,942,000,000 KWh at Basic Design Capacity. This volume of production would dedicate over $1,971,000 each year for energy alone for maintaining funding for local citizens of the community for local governing offices and voting support systems to maintain integrity in state and community offices.
1st PRIMARY SITE WITH MOLECULAR REFINERY
Sumter County Florida
SUMTER COUNTY: This site is a mid county location without ocean or bay.
Placing the Molecular Refinery for Waste to Energy and is just off of Interstate I75 |
POLK COUNTY: This site is a mid county location without ocean or bay.
Initial Power Supply of 75 MWh and Fuel would be transported from the Sumter Refinery site. |
LAKE COUNTY: This site is a mid county location without ocean or bay.
Initial Power Supply of 75 MWh and Fuel would be transported from the Sumter Refinery site. |
MARION COUNTY: This site is a mid county location without ocean or bay.
Initial Power Supply of 75 MWh and Fuel would be transported from the Sumter Refinery site. |
CITRUS COUNTY: This site is a Gulf Coast county location with bay.
Initial Power Supply of 75 MWh and Fuel would be transported from the Sumter Refinery site. |
PASCO COUNTY: This site is a Gulf Coast county location with bay.
Initial Power Supply of 75 MWh and Fuel would be transported from the Sumter Refinery site. |
General Project Value Summary
- Pilot site: Sumter County, site is over 300 acres and approved for 425 RV, Mobile Homes, Modular homes with mixed commercial, industrial and residential use.
Waterlines and sewage lines have already been installed and certified for use. Site upgrade would be to handle all for the water treatment processing, wastewater processing, Municipal Solid Waste (MSW) to be processed on this site with our new technology!